Most businesses can’t simply shut the doors for a week while they relocate. Staff still need phones, customers still expect orders, and every hour offline has a cost attached. That’s why office removals are less about lifting desks and more about sequencing: deciding what moves when, who does what, and which systems have to be live the moment people walk into the new building. Plan it properly and a relocation can happen between a Friday evening and a Monday morning, which is exactly how our office removals service is usually scheduled.
Start With A Floor Plan, Not A Box Count
The single most useful document in a business move is a plan of the new space with every desk, cabinet and printer marked on it. Number each position, give every item a matching label, and the unloading crew works silently from the plan instead of asking where things go.
It also forces useful decisions early. You’ll spot that the new office has fewer storage walls, that the meeting room won’t take the existing table, or that six filing cabinets are travelling for no good reason. Those conversations are cheap now and expensive at 7am on a Saturday.
Sort The IT & Connectivity First
Broadband is the thing that derails business moves. Installations at a new premises can take weeks rather than days, so the order should go in as soon as the lease is signed. Phone numbers usually port across, but the request needs notice too.
Work through the technical side in this order:
- Order the new internet line and confirm an install date in writing
- Arrange number porting or call diversion for the transition
- Check the new comms room has power, ventilation and cabling
- Back up everything before a single machine is unplugged
- Photograph the back of servers and switches before disconnecting
Label every cable at both ends. It sounds fussy, but it turns a Monday morning rebuild into a task measured in minutes rather than hours.
Move Outside Trading Hours
The simplest way to protect trading is to move when nobody’s trading. Evening, overnight and weekend relocations are standard in our line of work, and we operate seven days a week from 8am to 10pm, so the schedule can be shaped around your week rather than ours.
For larger offices, a phased move often works better. Non-essential departments and archive storage go first, core operations follow last, and the business never has more than a handful of people offline at once. Anything not needed immediately can sit in secure storage until the new layout settles, which stops the first week turning into an obstacle course of stacked crates.
Give Everyone A Clear Job
Business moves stall when responsibility is vague. Appoint one internal coordinator who owns the timeline and is the single point of contact for the removals team. Then give each employee one simple task: clear their own desk, pack their personal items into a labelled crate and empty their pedestal drawers.
Tell staff exactly when to do it and what to leave alone. Nobody should be unplugging their own monitor or dismantling a desk. Those jobs belong to people with the right tools and insurance, and a snapped bracket on moving night is an avoidable delay.
Don’t Forget The Paperwork Side
Confidential files need handling properly under data protection rules, so keep them in sealed, tracked crates rather than open boxes. Anything past its retention period should be securely destroyed before the move, not carried to a new filing cabinet. The ICO’s guidance for organisations is a sensible reference point when deciding what to keep.
Update The Outside World Before You Go
An address change affects more than your letterhead. Companies House, HMRC, your insurers, your bank and your suppliers all need telling, and you can update most registered details through GOV.UK.
Don’t overlook your online presence either. Google Business Profile, your website footer, invoice templates, email signatures and any directory listings should all change on the same day the doors open. Customers turning up at the old address is a needless first impression.
Plan The First Morning In The New Space
Set a realistic expectation for day one. Reception, phones, the main workstations and the kettle matter. Perfect storage does not. Ask your removals team to prioritise unloading in that order, and keep a small crew available on the first morning for the inevitable repositioning once people sit down and realise the layout needs adjusting.
A quick walkthrough with the team lead at the end of the move catches damage, missing crates and anything left behind, while everyone is still on site.
Frequently Asked Questions
How Far In Advance Should We Book An Office Move?
Six to eight weeks gives enough time for IT provisioning and a proper survey. Smaller offices can often be arranged with less notice.
Can You Move Us Overnight Or At A Weekend?
Yes. Out-of-hours moves are common for businesses, and we work seven days a week to fit around trading hours.
Do You Dismantle & Rebuild Office Furniture?
We do. Desks, partitions and shelving are taken apart, transported and reassembled in the positions marked on your floor plan.
What Should Staff Do Before The Move?
Each person should clear their desk, empty drawers and pack personal belongings into a labelled crate. Leave equipment, cabling and furniture to the crew.